Geotechnical

Track Record

1

Project: Soil Investigation and sand testing Works at Jurong Island and Tuas View Extension for Penta Ocean

Client: Penta-Ocean Construction Co., Ltd.

Period: December 2005 to March 2009

Photo Source: Penta-Ocean (Web)

2

Project: SI, Instrumentation and monitoring for Tuas View Extension Phase A3a

Client: Hyundai Van Oord JV

Period: November 2010 to June 2014

3

Project: SI, Instrumentation & monitoring and material testing at Tuas West MRT Depot

Client: Jurong Primewide

Period: November 2011 to July 2016

4

Project: Soil Investigation, Instrumentation and Monitoring at Ayer Merbau (Real-Time ATMS monitoring)

Client: Koon Construction

Period: January 2013 to July 2015

5

Project: Soil Investigation, Instrumentation and Monitoring works for Jurong Island Westward Extension

Client: Dredging International Asia Pacific

Period: September 2014 to October 2019

Photo Source: Dredging Internation Project Photo Album

6

Project: Soil Investigation, Instrumentation, and Monitoring for Infilling works at APSG and Pulau Tekong

Client: Santarli Construction Pte Ltd

Period: February 2015 to December 2019

Photo Source: Santarli Construction Pte Ltd (Website)

7

Project: Reclamation at Ayer Merbau Phase 2

Client: Dredging International Asia Pacific

Period: September 2017 to December 2020

Photo Source: Asia Infrastructure Solutions (Web)

8

Project: RI Cone Penetration Test for Tekong Phase 2

Client: Ryobi Geotechnique International Pte Ltd

Period: December 2018 to On-going

Photo Source: en.hdec.kr

9

Project: RI Cone Penetration Test for Land Preparation at Changi East (DSTA)

Client: APS Asia PDA Enterprise Pte. Ltd.

Period: April 2019 to On-going

Photo Source: KTC Group Website

 

10

Project: RI-CPT for Tuas Terminal Reclamation, Wharf Construction and Dredging Phase 2 (Finger 3)

Client: PENTA-OCEAN / HYUNDAI / BOSKALIS JOINT VENTURE

Period: August 2023 to On-going

Photo Source: https://tuasmegaportdredgingproject.wordpress.com/home/

11

Project: Soil Investigation, Instrumentation, and Monitoring works at Bay East

Client: Santarli Construction Pte Ltd

Period: April 2024 to On-going

Photo Source: Garden by the bay

12

Project: Soil Investigation at Micron Woodlands

Client: Exyte Singapore Pte Ltd

Period: June 2024 to December 2024

*Listed projects are more than SGD100,000. There are more than 1000 small projects are not listed here.