1
Project: Full Structural Audit & As-building of 21 Blocks of Bungalows at Rochester Park
Client: JTC Corporation
Period: April 2013 to November 2013
2
Project: Structural Investigation of Existing Wharf/ Jetty at 9 Pioneer Place, Gul Regional Base
Client: Police Coast Guard, Ministry of Home Affairs
Period: October 2014 to December 2014
3
Project: Concrete Testing of Existing Admiral Dock at 50 Gul Road
Client: Keppel Fels Ltd thru Steen Consultants Pte Ltd
Period: July 2016 to August 2016
4
Project: Periodic Structural Inspection – 30 units of Existing Industrial Standard Factories Tuas, Joo Koon Area
Client: JTC Corporation thru C&W Services Pte Ltd
Period: September 2017 to December 2017
5
Project: Structural Survey of Existing Jetties (Finger Piers 1 & 2) at 55 Gul Road
Client: Keppel Fels Ltd thru Double S Construction Pte Ltd
Period: March 2021 to April 2022
6
Project: Analysis of Slope Failure at Jurong Hill Park (Slopes 1 -4)
Client: JTC Corporation thru SMM Pte Ltd
Period: April 2022
7
Project: Inspection and Non-destructive Testing for the Existing Wharf at 51 Pioneer Sector 1
Period: April 2023 to May 2023
8
Project: Void detection on existing ground slab at ASH Plant, Flat bottom tank area and Vicinity of the Industrial Complex at 24 Jalan Buroh
Client: Air Liquide Singapore Private Limited thru Uni-Associated Consultants
Period: August 2023 to November 2023