Building Assessment Works

Track Record

1

Project: Full Structural Audit & As-building of 21 Blocks of Bungalows at Rochester Park

Client: JTC Corporation

Period: April 2013 to November 2013

2

Project:  Structural Investigation of Existing Wharf/ Jetty at 9 Pioneer Place, Gul Regional Base

Client: Police Coast Guard, Ministry of Home Affairs

Period: October 2014 to December 2014

3

Project:  Concrete Testing of Existing Admiral Dock at 50 Gul Road

Client: Keppel Fels Ltd thru Steen Consultants Pte Ltd

Period: July 2016 to August 2016

4

Project:  Periodic Structural Inspection – 30 units of Existing Industrial Standard Factories Tuas, Joo Koon Area

Client: JTC Corporation thru C&W Services Pte Ltd

Period: September 2017 to December 2017

5

Project:  Structural Survey of Existing Jetties (Finger Piers 1 & 2) at 55 Gul Road

Client: Keppel Fels Ltd thru Double S Construction Pte Ltd

Period: March 2021 to April 2022

6

Project:  Analysis of Slope Failure at Jurong Hill Park  (Slopes 1 -4)

Client: JTC Corporation thru SMM Pte Ltd

Period: April 2022

7

Project:  Inspection and Non-destructive Testing for the Existing Wharf at 51 Pioneer Sector 1

Client: Keppel Fels Ltd thru Double S Construction Pte Ltd

Period: April 2023 to May 2023

8

Project: Void detection on existing ground slab at ASH Plant, Flat bottom tank area and Vicinity of the Industrial Complex at 24 Jalan Buroh

Client: Air Liquide Singapore Private Limited thru Uni-Associated Consultants

Period: August 2023 to November 2023

*Listed projects are more than SGD75,000.